Why roofing quotes vary so widely
Roof renovation
6 min read

Why roofing quotes vary so widely

Quotes for the same roof vary because they include different amounts of work, not because one makes more profit. The difference almost always lies in the roof boarding, the underlay, the lead work and the question of who actually carries out the work.
Portrait of an Astrodak roofer at work on a roof
Fouad · Owner of Astrodak Service
Updated on 21 August 2026
Roofer in an Astrodak Service shirt surveying a pitched roof under construction with stacks of roof tiles on the battens
What is one amount on paper consists of work you can no longer see later.
It is one of the most confusing things about roof work: you ask for the same thing, and you get amounts back that are hundreds of euros apart. Then you start to doubt the highest one. Or, more often, yourself.
In almost every case I know of, the difference is not in the margin. It is in the amount of work included. And that is exactly the tricky part: the work that makes the difference is the work you can no longer see after completion.

Four places where the difference arises

1
The roof boarding. Under old tiles there is timber that can be soft in places after thirty years. One supplier includes replacement, the other assumes it will be fine. If it is not fine, you are left with an open roof and a conversation about extra work.
2
The underlay. Every quote says ‘membrane’. There is membrane that lasts thirty years and membrane that crumbles after eight. The price differs by a few hundred euros; the consequences differ by a roof's lifetime.
3
The lead and zinc work. Lead flashings around the chimney, valley gutters and wall junctions. Precision work, and the first thing to be skipped when the price has to be sharp. Reusing old lead is a day quicker and ten years shorter.
4
Who does the work. Some suppliers are intermediaries, not roofers. Your job is sold on and every link in the chain keeps something. The craftsman on your roof works with what is left.
“A low price is usually not a sharp price. It is a shorter list.”
Fouad, owner of Astrodak Service

What you cannot get from a quote

How carefully someone works is not written anywhere. Whether the ridge tiles are set out neatly, whether the membrane runs properly into the gutter, whether the lead is worked in with a decent overlap: that is craftsmanship and it cannot be costed. What you can do is ask who will come and whether they are the same people the company employs.
With us, that answer is always the same. I come to have a look with my colleagues and our own team does the work. That is why I dare to give a fixed price and a 100% guarantee.

The question that tells you the most

If you ask one question, ask this one: what happens if the roof boarding turns out to be worse than you think now? A good answer states in advance what will happen then and what that means. A vague answer is an announcement of extra work. More on this in avoiding extra work.
Free roof inspection

Want to know what your roof will cost?

A price per m² is a guideline, not a quote. I come round with my colleagues, we measure the roof, look at the structure and then send a quote with a fixed price. The inspection is free and puts you under no obligation.

Why the same roof can be two different jobs

Take two terraced houses from the same year of construction, in the same street in Vught. Same roof area, same tiles. On one, the roof boarding is bone dry and only the tiles and battens come off. On the other, water has run along a poor valley gutter for years and part of the roof boarding has gone soft. That second roof needs an extra day of work and new timber.
Anyone who does not have that difference in view beforehand gives the same price for both homes. For one it is right, for the other it is not, and then comes the conversation about extra work that nobody wants. That is exactly why I come and look first, and also tap the roof boarding in the attic before an amount goes on paper.

What belongs in a complete quote

Not as a checklist to score suppliers, but so that you know whether you are comparing like with like. These items should be named: the build-up of the roof from inside to outside, the lead and zinc work, the ridge finish, the scaffolding or access equipment, the disposal of the old material, the lead time and the guarantee. In what a good roofing quote contains we go through it item by item.
And if something is not clear: just call. I would rather spend half an hour explaining how a roof is put together than have you make a choice based on an amount at the bottom of a PDF. Also have a look at what we have completed before.

How to judge the lowest quote

If one supplier is far below the rest, the most useful question is not why they are so low but what they do less of. Put the descriptions side by side and look for the items named by one and not by the other. Lead work, roof boarding, scaffolding and disposal are the four where it almost always lies.
And if a quote is just a total amount without a description, it cannot be compared. That is not criticism of the supplier, it is a statement of fact: you cannot judge what you are buying. Ask for a breakdown, and if it does not come, that tells you something too.

Frequently asked questions about roofing quotes

Because it usually includes less work. Missing roof boarding, reused lead or a lighter membrane lower the price today and raise the costs in five to ten years. The final bill is the quote plus whatever gets added later.

Ask directly: is the crew employed by the company, and who can you speak to during the work? With us, the answer is that I come round with my colleagues and our own team does the work.

Some extra work does happen, because a roof is never fully visible until it is open. What is not normal is for it to come as a surprise. We state in advance what the risks are and what will happen then.

With us it is usually thirty days, because material prices and planning change. If it expires while you are still thinking it over, we simply extend it. It is not a pressure tactic.

Request a free roof inspection

Leave your details and I will get in touch the same day to schedule a free inspection.
100% no obligation
·
Same-day response
Portrait of an Astrodak roofer at work on a roof
Talk to the roofer directly
Fouad · your single point of contact
Guarantees
Certified Roofer quality mark, checked and qualified, with a green tick
VCA certified logo
Pinnen Ja Graag logo (card payments welcome)
Google G logo
5.0 from 50 reviews

More from the knowledge base

Aerial photo of a house with a red tiled roof and scaffolding with an Astrodak Service banner during roofing work
Roof renovation

What is the best time of year for roof work?

6 October 2026 ·
House with a red tiled roof and scaffolding with an Astrodak Service banner during roof work, with solar panels on the roof
Roof renovation

Solar panels on your roof: have the roof checked first

6 October 2026 ·
Astrodak roofer working on a roof edge with lead work above a brick wall
Roof renovation

Permits for roof work: when do you need one?

21 August 2026 ·
Menu